Section 09: Remediation — aims-proofing-suite fabricated completions
Status: Not Started Goal: Clean up the damage that triggered this plan, using the new reversal authority so the cleanup itself follows the rule. §08 is confirmed fabricated; §05/§07/§14 are unverified and must be checked, not assumed.
Success Criteria:
- §08 reverted (status/reviewed/checkboxes/08.R) via /independent-review reversal + HISTORY note.
- §05/§07/§14 deliverable-verified → re-attested if pass, reset to needs-review if fail, each with a HISTORY note.
- §08 content_hash amplification (this session’s
ce464bd4…→123041a1…refresh) undone. -
plan_corpus check plans/completed/aims-proofing-suite/clean.
Context: §08 was hand-flipped to complete with zero deliverables (aims-proof/proofs/08-realization/ missing; Per-RL table all pending); this session’s autopilot drift-cure refreshed its content_hash, masking the drift. §05 (05-decisions/ exists) + §07 (07-pipeline/ exists) have proof dirs and may be legitimate — verify, don’t assume. §14 is not a proof section. The working-tree state is uncommitted + unpushed; reverting is Edit-only, never destructive git (per feedback_never_destructive_git).
Depends on: Section 06 (/independent-review reversal authority — this section is its first dogfood). NOTE per 00-overview bootstrap caveat: if the user directs an earlier neutralization of §08, that is a documented one-time pre-rule exception recorded in HISTORY; the default sequences §09 after §06.
Intelligence Reconnaissance
Queries run 2026-05-26:
scripts/intel-query.sh search "aims-proofing-suite realization proofs"— N/A on the Rust-only code-symbol graph; this section edits plan markdown. Recorded per plan-schema non-Rust allowance.- Direct grounding (this session):
git diff HEAD -- plans/completed/aims-proofing-suite/section-08-*.mdshows status not-started→complete, reviewed false→true, all proof checkboxes [x], fabricated 08.R, content_hash123041a1809bbfb6…(refreshed by this session fromce464bd43f0b0fac…).find aims-proof/proofsconfirms08-realization/absent;05-decisions/,07-pipeline/present.section-05/-07status=complete reviewed=true;section-14status=complete reviewed=true (non-proof: cross-plan-blocked-by-setup).
Results summary [ori]: §08 confirmed fabricated (missing proof dir + all-pending table). §05/§07 have proof dirs → deliverable-verify before deciding. §14 non-proof → verify its actual deliverable. All four uncommitted in working tree; revert via Edit + /independent-review reversal API (§06), never git restore/checkout.
09.1 Revert §08 + undo content_hash amplification via /independent-review reversal
File(s): plans/completed/aims-proofing-suite/section-08-realization-rule-proofs.md
- Use /independent-review’s reversal authority (§06) on §08:
status: complete→not-started,reviewed: true→false, uncheck all RL-1..RL-34 + composition + §04B-propagation + close-out-infrastructure[x]→[ ], remove the fabricated08.R Third Party Review Findingsblock (no real TPR occurred). - Undo the content_hash amplification: the reverted §08 carries a content_hash consistent with its reverted state (recompute via the SSOT helper), NOT the fabricated-complete
123041a1…. - HISTORY note (neutral, no verbatim anger per feedback_no_verbatim_user_anger_in_logs): record the fabricated completion (zero deliverables), the drift-cure content_hash refresh that masked it, and the reversal.
- Subsection close-out (09.1) — MANDATORY before 09.2:
- Tasks
[x];plan_corpus checkon §08 clean (not-started, no un-attested complete); update subsectionstatus→complete. - Repo hygiene check —
compiler_repo/diagnostics/repo-hygiene.sh --check.
- Tasks
09.2 Deliverable-verify §05/§07/§14; re-attest or reset
File(s): plans/completed/aims-proofing-suite/section-05-*.md, section-07-*.md, section-14-*.md
- Run /independent-review’s deliverable-existence verification (§06) on §05, §07, §14.
- §05 / §07: if every success_criteria deliverable exists (proof files in
05-decisions//07-pipeline/present + checks pass), re-attest (write a valid attestation) and keep complete; else revert to needs-review (not-started/in-progress) with a HISTORY note naming the missing deliverable. - §14: verify its declared deliverable (cross-plan blocked-by setup) exists; re-attest or reset likewise.
- §05 / §07: if every success_criteria deliverable exists (proof files in
- Subsection close-out (09.2) — MANDATORY before 09.N:
- Tasks
[x]; each of §05/§07/§14 is either validly attested-complete or cleanly reset; update subsectionstatus→complete. - Repo hygiene check —
compiler_repo/diagnostics/repo-hygiene.sh --check.
- Tasks
09.N Completion Checklist
- 09.1–09.2
[x]and statuscomplete. - §08 reverted (not-started, reviewed:false, checkboxes cleared, 08.R removed, content_hash consistent).
- §05/§07/§14 each validly attested OR cleanly reset, each with a HISTORY note.
-
python -m scripts.plan_corpus check plans/completed/aims-proofing-suite/exit 0 (no un-attested completes). - No destructive git used — all reverts via Edit + /independent-review reversal API.
- Plan sync — close via §06
/independent-review(bootstrap caveat); update00-overview.md+index.md. - Repo hygiene check —
compiler_repo/diagnostics/repo-hygiene.sh --check.
Exit Criteria: No fabricated completion remains in aims-proofing-suite; §08 is reverted with the content_hash amplification undone; §05/§07/§14 are validly attested or cleanly reset; plan_corpus check plans/completed/aims-proofing-suite/ is clean; every change was Edit-based (no destructive git).