Functional Mission Lifecycle
8 sections
100%
Section 1 Criterion-model functional/technical classification SSOT Section 2 create-plan requires a plan-wide functional acceptance criterion Section 3 Drain gate becomes load-bearing + all-technical sibling drain Section 4 Coverage-driven grill-me front-end in /create-plan Section 5 review-section detects mission drift + emits proposed rewrites (tool) Section 6 review-plan re-grounds the functional mission + applies governed rewrites (hybrid) Section 7 Template + missions/rules sync Section 8 End-to-end acceptance + full test-all
Completed
8 sections
Section 1 Complete
Criterion-model functional/technical classification SSOT
4/4 tasks
Section 2 Complete
create-plan requires a plan-wide functional acceptance criterion
3/3 tasks
Section 3 Complete
Drain gate becomes load-bearing + all-technical sibling drain
3/3 tasks
Section 4 Complete
Coverage-driven grill-me front-end in /create-plan
5/5 tasks
Section 5 Complete
review-section detects mission drift + emits proposed rewrites (tool)
3/3 tasks
Section 6 Complete
review-plan re-grounds the functional mission + applies governed rewrites (hybrid)
4/4 tasks
Section 7 Complete
Template + missions/rules sync
3/3 tasks
Section 8 Complete
End-to-end acceptance + full test-all
2/2 tasks