inline-defect-mission-fit-criterion-safe-enactment
Goal
Ensure every schema-valid mission-fit or forward-coherence verdict is either fully enactable under INV-17 or rejected before authoritative mutation with a fresh criterion-grounded redispatch.
Acceptance
The prompt basis includes owned criterion definitions, ownership, and current verdict status. Rewrite transformations transfer criterion ownership atomically to deterministic replacement work items. Remove dispositions with pending owned criteria never create an apply marker or mutate route/content state, and the retry path invalidates the stale verdict and dispatches a corrected grounding judgment. Current-section and future-section callers share the same enforcement owner.
Work Items
- Make mission-fit and forward-coherence verdict enactment criterion-safe: include every section work item’s owned success criteria and satisfaction in the script-composed, content-keyed adjudication basis; reject unsafe unsatisfied-criterion removals before any apply marker or route mutation and force a corrected grounding dispatch; atomically re-home all owned criteria from rewritten items to their deterministic replacements; preserve idempotent recovery and audit receipts; and prove current-section plus future-section callers converge without partial plan/body/marker writes or INV-17 halts.
Intel dossier — pointer and tier disposition
Dossier: inline-defect-mission-fit-criterion-safe-enactment--s-3172afd0.intel.md (this section’s content/intel/ sidecar)
Read that dossier from line 1 through EOF before acting on this section. This block is a pointer and an audit record, never a substitute: not the BLUF, not a summary, not selected tiers.
| Dossier tier | Title | Lines | Disposition | Where / why |
|---|---|---|---|---|
| 0 | 0. Bottom line up front | 84 | pending | |
| 1 | 1. The target, verbatim | 54 | pending | |
| 2 | 2. Terrain (symbols + files) | 76 | pending | |
| 3 | 3. Code-graph recon | 178 | pending | |
| 3D | 3D. Diagnostic / observability surface | 31 | pending | |
| 3H | 3H. Hygiene constraints the downstream work inherits | 41 | pending | |
| 4 | 4. Cluster / family - the class this section audits | 72 | pending | |
| 5 | 5. Conformance audit (duplication / drift) | 31 | pending | |
| 6 | 6. Plan ownership - who owns this code now | 30 | pending | |
| 7 | 7. Prior art | 35 | pending | |
| 8 | 8. Sentiment - N/A | 9 | pending | |
| 9 | 9. Coverage gaps - what is dark and why | 21 | pending | |
| 10 | 10. Recon entry points - the ordered read path | 54 | pending |